Back
Detour Lake Mine ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Detour Lake Mine
ASSET TYPE
Operating
Operating METALS & MINERALS
Gold
OPERATOR
Detour Gold Corp.
SPECIFIC LOCATION
Detour Lake, Cochrane, Unorganized, North Part, ON, Canada
CURRENT ASSET STATUS
  • Near mine exploration
THE ONLY
The Largest gold producing mine not controlled by a senior producer.
THE LARGEST
Canada's largest gold Reserve.
ONE OF THE TOP
Second largest operating gold mine in Canada
REFERENCE OR DISTRICT NAME
Northeastern Ontario
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources: NI 43-101
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 17.4 k mt 1.33 g/t 746 k oz 0.5 g/t 66.2 k mt 1 g/t 2125 k oz 0.5 g/t 33.7 k mt 0.81 g/t 875 k oz 463
Mineral Reserves: NI 43-101
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 89.2 k mt 1.26 g/t 3603 k oz 0 g/t 351 k mt 0.95 g/t 10779 k oz 0 g/t 0
DISCOVERY COST
Reserve: Gold (oz)
$ 4.00
SNAPSHOT
THE PRODUCTS YOU SELL ARE
Gold
Total mine construction cost (US$m)
500
Processing Method
Mill
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2013 2014 2015 2017 2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
128392100100000000Capital Expenditures13
121690.7100000000Ore Tons Mined23
111754114100000000Mill Feed - Ore Tons Processed33
232456505.56100000000Gold (k oz) Produced792
212423486.24100000000Gold (k oz) Sold791
000100000000Gold Recovery (%)794
9281182675100000000Cash Operating Cost43
00840100000000All - in Sustaining Costs53
002.9100000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
CAT 795F253188 320
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
0
Peak power demand MW
Environmental Impact Assessment, man hours
0
Engineering firms
0
Local firms
0
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost USDOperating Expenses USDNVP USDDiscount RatePayback periodAfter tax IRRGold (oz)USD
Assumed Exchange Rate
1 AUD = 0 USD
Feasibility Highlights
Total Pre-tax-undiscounted Mine-life cash flow (US$ m)
US$ 3700 million
Date of Assessment
Jul 20, 2026
Prepared by
SGS Canada Inc.
Mine-life (in years)
20
ACCESS TO PROPERTY
ROAD ACCESS
AIRPORT ACCESS
AIRPORT NAME
ESTIMATED TRAVEL TIME
1
SITE VISIT AVAILABILITY

FreeText