ASSET NAME
West Detour
ASSET TYPE
Development
Development METALS & MINERALS
Gold
SPECIFIC LOCATION
Detour Lake, Unorganized Thunder Bay District, ON P0T, Canada
CURRENT ASSET STATUS
  • Drilling
  • Fully permitted
REFERENCE OR DISTRICT NAME
Detour Lake
OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Detour Gold 100
0
0
CONDITIONAL OWNERSHIP NOTES

4.3 Summary of NSR and Other Obligations The Property is subject to the following NSR obligations presented in Table 4-2 and Figure 4-2). Prism Resources Inc. holds a 7.5% net profit interest on the Aurora and Sunday Lake properties. Effective November 28, 2012, the Company bought back Goldcorp’s 1% NSR on the Mine Property for $1 million. Table 4-2 NSR Obligations Property NSR Amount NSR Holder Buy-out Option Blocks A through E except Block A North 1% Goldcorp $1,000,000 Blocks A through E 2% Franco-Nevada none Mine Property 2% Franco-Nevada none Purchased Claims (Individual) 2% Individual Prospector none Gowest 1% Franco-Nevada $750,0001 (1) The Company has the option to acquire 50% of the royalty on the Gowest property at any time up to the date which is one year from the date “Commercial Production” commences on the Gowest property, as defined in the agreement relating to the acquisition of the Gowest property by Trade Winds.

ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
Permitting (License)Dec 20, 2016 Jan 20, 2017 100%
Install equipmentDec 20, 2016 Jan 20, 2017 100%
First pourDec 20, 2016 Jan 20, 2017 100%
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources: NI 43-101
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0.4 k mt 0.85 g/t 10 k oz 0 g/t 36.5 k mt 0.86 g/t 1005 k oz 0 g/t 8.6 k mt 0.89 g/t 246 k oz 0
Mineral Reserves: NI 43-101
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 1.8 k mt 0.99 g/t 56 k oz 0 g/t 47 k mt 0.97 g/t 1473 k oz 0 g/t 0
DRILLING STATUS
NEW RESOURCE ESTIMATES ANTICIPATED ON
Mar 22, 2017
DRILLING PROGRAM COMMENCED
1000 meter drill program commenced with active drills
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Gold (k oz) Sold791
00000000Gold Recovery (%)794
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
CAT 77730916 98
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)
Date of Assessment
Jul 20, 2026